Turn-Key Installation

Customers may choose any one of the services we offer, however the best customer approach is generally to engage us to provide a turn-key project. Through the turn-key approach, URG takes responsibility for all phases of the project and the customer maintains go-ahead approval control at each project step:


1. The Initial Survey

  • Review past energy conservation efforts,

  • Outline Energy Conservation Measures (ECMs) planned or underway

  • Establish minimum return-on-investment requirements

  • Establish areas which have too much or too little light

  • Review any existing maintenance problem areas

  • Outline and schedule the process from walk-through to implementation

  • Verify any utility rebate opportunities

  • Review financing options

​​

2. Preliminary Assessment

  • Complete a facility walk-through

  • Confirm hours of operation by area

  • Obtain 12 months of utility bills

  • Review replacement technologies relative to existing equipment

  • Review economics of replacement options relative to ROI requirements

​​

3. Investment Grade Audit

  • Complete room-by-room lighting inventory

  • Measure existing light levels

  • Install occupancy monitoring equipment where appropriate

  • Evaluate existing esthetic and/or light-level concerns

  • Choose systems offering optimal performance and energy savings

  • Detail areas where custom designed fixtures may offer an opportunity

​​

4. Project Implementation (contract initiation)

  • Complete pre construction meeting to determine contacts, schedules, security, safety, access, work hours and material staging

  • Begin installation, project tracking (via Microsoft Project) and weekly construction meetings, and periodic hazardous waste pickups

​​

5. Project Closeout

  • Complete project punch list, final waste pickups and as-built drawings

  • Measure and verify light levels and savings

  • Provide warranty documentation